Power Outage in Organized Industrial Zones

A 3-day power cut will be applied in all OIZs in Turkey. This situation caused the production of OIZs to stop. Employees will be considered on leave.

As of January 21, natural gas use of factories 40 percent As of January 24, all OIZs in Turkey Electricity cut will be applied for 3 to 4 days. announced. In the letter sent by TEİAŞ to OIZs, companies can use electricity for lighting and security However, it was stated that electricity cannot be used for production.

All organized industrial zones in Turkey due to natural gas-induced electricity shortage and supply problems. will suspend their production explained. Simultaneously The supply industry may also stop. With the electricity shortage in the organized industrial zones, the production in the country at least 3 days is said to stop.

Technical disruption in distribution lines grew like an avalanche

Antalya Organized Industrial Zone President Ali Bahar said, “There may be problems in accessing basic necessities. Agriculture, manufacturing and logistics sectors are vital sectors that rotate daily and have daily needs. Disruption of these sectors may lead to a great supply shortage throughout the country,” he said. Also, Bahar, your decision in need and employment will cause major problems and big losses He said he will live.

The problems started with the 40% restriction of natural gas sent to OIZs due to technical problems in natural gas distribution. The supply problem interrupted the production of companies producing electricity from natural gas, and then going to power cut reported.

in production perishable material Factories using this situation are quite to a great loss will come by. However, great difficulties will arise in factories that produce daily meals, disinfectants, dairy products and many more. In addition, laundries serving hotels will stop. tourism sector will also be disrupted.

Started sending sms to employees

osb

RELATED NEWS

Signature Campaign Launched for the Withdrawal of Electricity and Natural Gas Increases: Reactions Moved to Social Media

Many OIZs made written statements on the subject and stopped production explained. However, an engineer friend of ours was also told that he was on leave due to a power cut in a message from his workplace. OSBs started to struggle to reduce outages from 3 days to 2 days.

Source :
https://www.sozcu.com.tr/2022/gundem/istanbulda-da-hissedilen-deprem-meydana-geldi-6905964/?utm_source=dahafazla_haber&utm_medium=free&utm_campaign=dahafazlahaber


source site-34