Tesla’s Germany Factory May Deplete Water Resources

A new one has been added to the endless troubles of the German factory, which could not be opened due to the problems of Tesla. Authorities in the region stated that the facility may deplete local water resources; Therefore, he stated that more resources will need to be extracted.

Electric vehicles are becoming more and more common as greenhouse gas emissions increase the effects of climate change significantly. Many giant automakers are also planning to switch to fully electric cars in the coming years. Owned by Elon Musk, the richest person in the world Tesla company is described as a pioneer in these vehicles and is shown as the world’s largest electric car manufacturer.

Tesla made a statement in November 2019 in Germany. First production facility (Gigafactory) in Europe announced that he would. However, this factory, which will be built in a wooded area the size of 130 football fields, was criticized by environmental organizations. It was also stated that the factory would make a ‘nature massacre’ and damage the living spaces of living things. Despite this, the construction of the factory continued. Now, a statement came from the German authorities about a problem that the factory may cause.

May deplete local water resources

It was stated in the news that the factory may cause water shortages. Wasserverband Strausberg-Erkner (WSE), a water company in the state of Brandenburg where the plant is located, said in its statements that local water reserves famine He said it started to happen. WSE notes that insufficient groundwater extraction is the cause; He stated that it is difficult to carry out further commercial and industrial activities in the region without additional landing permits.

In addition, a local public department stated that local water resources can only support the existing scale of operation of the factory, further development is needed. running out of water stated that it could pose a risk. In addition, Brandenburg Economy Minister Joerg Steinbach said that the existing water supply is sufficient for the first phase of the plant; however, he stressed that a possible expansion would require more water resources. In short, these explanations are the Tesla factory’s may deplete local water resources. showed.

Finally, let’s add that Tesla has a contract with the local government on water. This contract states that the plant will receive 1.4 million cubic meters of water per year. This is about 40,000 people equal to the water requirement of a settlement. The contract also states that a sewage treatment plant will be built for adequate water supply. However, management admits that such a large project could take years.

It is still unclear when the factory will open

tesla factory

What Tesla describes as very important for the European market, where electric vehicles are rising rapidly, Producing 500 thousand vehicles and creating employment for 12 thousand people The expected factory was opened with a ceremony in the past months; However, let’s not forget that it could not be put into operation due to some approval problems.

There has been an important development in this regard in the past weeks. In the news, Tesla’s factory has been confirmed by local authorities. receives final production approvalIt was stated that in the coming weeks, it could obtain the necessary license to start operating.

RELATED NEWS

Tesla Claimed to be Working on New Air Vehicles: So What Technology Will It Have?

Source :
https://www.gizchina.com/2022/03/19/tesla-berlin-plant-will-run-out-of-local-water-german-water-company-says/


source site-36