Application deadline for the SolarUp Accelerator Program is April 11

Applications have been opened for the SolarUp Acceleration Program organized by Kalyon PV, which aims to support projects that can have an impact in the sustainable energy sector. After Ankara, the project-based deadline for SolarUp, which also meets the Istanbul ecosystem with the meetup held at Maslak Kolektif House on March 25, is April 11th. Here are the details…


Maximum power limit increased for solar plants

The Board decision of the Energy Market Regulatory Authority (EMRA) was published in the Official Gazette. The maximum power limit for unlicensed SPPs is 25 kW!

Kalyon Holding continues to work for sustainable energy!

Kalyon Holding; In order to build a better tomorrow for society, the environment and future generations, it resolutely continues its investments in this field by focusing on sustainability and clean energy in its business strategy. One of the Kalyon Holding subsidiaries, Kalyon PV, which is the largest investment ever made in this field in Turkey with the production of renewable energy and renewable energy technologies, works with the aim of becoming a production center that not only develops panels and energy, but also technology.

Kalyon PV, which provides employment for over 2 thousand people in an area of ​​100 thousand square meters in the Capital Organized Industrial Zone, established a solar power plant on an area of ​​​​about 20 million square meters in the Karapınar district of Konya; It prevents 2 million tons of fossil waste and carbon emissions annually.

SolarUp Acceleration Program in cooperation with Kalyon PV and Viveka

Aiming to make clean and renewable energy more accessible, Kalyon PV; launched the ‘SolarUp Acceleration Program’ in cooperation with Viveka in order to implement innovative technologies and support the ecosystem. Kalyon PV, the world’s first and only production facility that gathers solar panel production consisting of four different stages, namely billet (ingot), slice (wafer), cell and panel, under one roof, aims to increase its domestic production power while supporting innovative technology and business models with SolarUp.

SolarUp, which came together with the ecosystem at the first meeting (meetup) held in Ankara TEKMER on March 17, was implemented in order to realize Turkey’s most important move in sustainable energy with innovative ideas and technologies. The project-based deadline for SolarUp, which met with the Istanbul ecosystem with the second meetup held at Maslak Kolektif House on March 25 and met with great interest, is April 11th.

Organized by Kalyon PV and aiming to support projects that can have an impact in the sustainable energy sector, SolarUp Acceleration Program works on renewable energy, innovative materials, digital transformation, production technologies, recycling technologies, solar energy production technologies, sustainability and occupational safety in the field of energy; It draws attention with its innovative technology product or prototype, and Kalyon PV is aimed at participants who can develop solutions to their focus areas.

PoC budget of 50 thousand TL

Carrying out its activities in 4 different production stages of solar panel technologies, Kalyon PV awaits the participants’ scalable technology solutions in the fields of Sustainability, Solar Energy, Industry 4.0, Smart Machines, Green Technologies, Digital Transformation and Innovative Materials at SolarUp.

Participating in the program, in which the participants will be supported by workshops, trainings and a PoC budget of 50 thousand TL, and the business model; The application form can be accessed from the link http://bit.ly/solar-up to experience all 4 stages of solar panel production at the world’s first and only production facility and Konya Karapınar Solar Power Plant. For detailed information, just click on the www.viveka.com.tr/solarup page.

source site-31