A video showing the developments in the Gemlik factory, where our domestic car will be produced, was published on TOGG’s official Twitter account. In this way, the current developments in the production facility were announced.
A few weeks ago, we shared the images of the factory where the domestic and national automobile project undertaken by Turkey’s Automobile Initiative Group (TOGG) will be produced. Today, new images came from the factory, which has been under construction for a long time.
The developments in the production facility were announced with the video shared from the official Twitter account of Turkey’s domestic automobile initiative TOGG. of the production factory in Gemlik, Bursa. assembly, body and paint plant information about the current status was given.
Latest developments at TOGG Gemlik Factory:
One of the most prominent projects of Turkey in recent years is undoubtedly the automobile production project implemented by Turkey’s Automobile Initiative Group (TOGG). Introduced to the whole world at CES 2022, the world’s largest technology fair held at the beginning of this year. Gemlik Facility, where the car will go into mass production work continues.
Officials from TOGG’s official Twitter account today evening. “Work plans at our Gemlik Facility are progressing without slowing down. If you’re wondering how far we’ve come, watch our video.” He shared a video with his note. TOGG, thanks to the video that reached thousands of people in a short time, in Bursa Gemlik. current state of the factory gave information about
In the factory where in-plant production works continue:
In the paint facility;
- 14 thousand 600 tons of steel was assembled,
- 35 thousand m² of roof-facade panel installation has been completed,
- Blind formwork installation of 19,734 m² has been completed.
In the body facility;
- 5 thousand 350 tons of steel production has been completed,
- Installation of 60 thousand m² of roof-facade sandwich panel has been completed,
- 51 thousand 500 m² of blind formwork was installed.
In the assembly facility;
- 8 thousand tons of steel production was completed,
- 79 thousand m² of roof-facade sandwich panel installation has been completed,
- Blind formwork was installed on 72 thousand m².